The back of the tunnel tickets, in the old, old, old days used to have a cross sectional diagram showing the trams running under the roadway. However, that was only a suggestion in the early design phase. As built, the roadway was lowered to allow taller vehicles to use the l/h lanes, thus reducing the space under the road deck. It was subsequently used for extra ventilation, and cross river utilities.