Jump to content
 

Outer track crossing over inner track (N gauge)


E Greene
 Share

Recommended Posts

Hi

 

Say I have a loop of double parallel track going around in an oval.  What parts do you use to get the outer track to crossover the inner so you have the two parallel tracks breaking off to another section if that makes sense.  I use peco and electrofrog points.

 

Thank you.

Link to post
Share on other sites

You could do with track planning software such as Anyrail which has a free demo version.

 

You need two turnouts and a cross-over or slip as shown below

 

Drawing shows Streamline elements but Setrack can be used.

 

I drew in OO but the principle is the same

crossovers doodle.jpg

Edited by RobinofLoxley
  • Like 1
Link to post
Share on other sites

I have a double track junction like the top one in @RobinofLoxley 's diagram above, built using large radius Peco turnouts and a long crossing.

 

What will take you some effort is getting the power feeds for the long crossing sorted out. My recommendation is to fully isolate the long crossing (IRJs on all the rails) and then have wiring to set the polarity of the 2 frogs. In my case this is done using the point motor on the outermost turnout (ie top one in the diagram), making the simple assumption that the setting of this turnout determines whether a train can traverse the long crossing to/from the outer track - which it should if things are correctly interlocked. This typically requires the point motor to have two switches linked to the motor position - as available with MP5 and Cobalt pms, for example - one for each frog on the long crossing.

 

If you are not using point motors, you will have to provide the equivalent function with switches.

 

Yours, Mike

Link to post
Share on other sites

  • RMweb Premium
7 hours ago, KingEdwardII said:

What will take you some effort is getting the power feeds for the long crossing sorted out.

 

True, and so I would probably go for an insulfrog crossing 😝 ..... at a double junction I would expect most trains to be carrying enough speed not to stall on the frogs.

Link to post
Share on other sites

Just to note that in modern era, a second track for the diverging route can be formed from a switch to the left of the crossover in the bottom image shared by @DCB. The other alternative, is that you have a single lead junction as shown and then the single track divides into two after the junction.

 

An example of the former is at Meadowhall station just north of Sheffield where the Barnsley and Rotherham lines meet. That layout has three tracks for a fair distance. An example of the latter is at Darlington, to the south of the station, where the route from Middlesbrough joins the ECML.

 

Network Rail and late BR practice tend to avoid crossovers in favour of switches.  

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...