coombe junction - moorswater - episode V - the cladding strikes back...
Update
Good evening - As mentioned in the last update, work has been progressing on the cladding for the dries building. The roof and walls have had their basic covering using the method of preparing each elevation on a card backing sheet (so as to work on the flat) and then each applied to the building. The conveyor has also been clad and I have now applied trims to the corners to replicate the corner cladding capping pieces as well as disguise the thickness of the evergreen sheet.
This evening, I have formed the rooftop vent and also the large sliding doors, which I have left slightly open to hopefully make it a little more interesting even though I am not planning to do the interior decs of the dries building.
The slight yellow staining is from my almost finished bottle of MEK and I now need to give it a wash of grey car primer to see how it fairs. I would like to press on with the cladding for the other building before I begin any trial painting of weathering of this one.
I attach a few pics - sorry about the quality - perhaps should have waited for natural light tomorrow instead of relying on camera flash
Plan shot showing conveyor and roof vent...
Overall scope of building captured...
From the end which appears to be the most photographed on the prototype...
Sliding doors have been modelled slightly open...
- 1
18 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now