Nearly there
Progress. I've been stalling over how to hold down/at right spacing/move the switch blades on my attempt at a P4 point, today saw the switch blades trimmed to length, connected to a tie-bar and a start on gluing down the switch rail chairs. I'm pleased with the look of it, not prototypical, but a vast improvement on Peco and a fish van ran through the point smoothly. I will add the check rails next and then finish gluing down the chairs I left loose as I tweaked the rail to gauge. Ah, I must add power feeds too.
- 3
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now