Some pictures of my rake of MBAs made from resin kits by N thusiast trains. I think I started running these on the finished layout just around the time that Farish produced them. These were very good kits but the resin was prone to warping with changes in temperature.
The track on the front of the layout did not take very long to be laid. The station throat across the bridges joins the more countrified area of the yard and sidings to the city end of the main station.