Lots of chickens and eggs at this point since certain parts of the layout had to be finished in the centre section before other things could happen. Bridge sides had to be fitted so that ballasting could continue. Also ballasting needed to go onto the edges of walls, platforms and embankments so some of those were needed too. Embankments were PVA and kitchen roll over polystyrene
The cafe and waterway museum needed to be checked for space on the dock side. Bridge sides f